We value your privacy

We and our digital partners use cookies on this website. Some of them are necessary for the functionality of the website, but you can decide on the following cookies yourself.

Settings
Decline all
Accept all

Necessary/functional

It would not be possible to operate the website without these cookies. They include, for example, cookies for storing selected settings or remembering logins.

Always active

Analytics

These cookies are used to measure and analyze traffic to our website (number of visitors, pages viewed, average browsing time, etc.). By consent, you will allow us to obtain data on how you use our site.


Advertisement

They are used for the purposes of advertisements displayed on third-party websites, including social networks and contextual advertising. They are tailored to your preferences and help us measure the effectiveness of our advertising campaigns. If you disable them, your ad will continue to show as you browse, but it will not be tailored to you and will be less relevant to you.


Save settings
Accept all
Product Solutions Production

TPV – pre-production preparation

QAD TPV Plus

Drawings, manufactured items and BOMs are created by the R&D Department in CAD/PLM/PDM systems. Purchased materials are managed by purchasers in the enterprise system. There is nothing worse than these two systems failing to communicate with one another. TPV Plus ensures efficient cooperation and data sharing among all processes within these systems while increasing the level of convenience for process engineers when creating work procedures.

With QAD TPV Plus, you get:

 
  • Reduced development and production preparation time
  • Time savings for process engineers that create BOMs and procedures
  • Streamlined communication between the development department, process engineers and production

Features

 
  • The material code list is maintained by the purchaser and provided to the developers’ tools for use in BOMs
  • Developers create new production items in their systems, creating drawings, models, and BOMs
  • The production items and BOMs are then sent to QAD TPV Plus where a process engineer can modify the design BOMs into production ones
  • The process engineer then creates work procedures using industry standards to calculate the production times of the operations
  • Change management is simplified as all business processes are interlinked within the enterprise